Mark and Kevin Daw did some extensive dry prime testing on 2522 today using a couple of external vacuum gauges. When it was all said and done the pump lost nine pounds over the course of the test. By the documentation we have that is acceptable. In the efforts to fully drain the pump it appears that a minute amount of what we believe to be Class A foam/water may be continuously entering the pump through an unknown route. The foam/water kept coming out of the main drain (no vacuum). One might think that the rate of accumulation would be greater under vacuum. We will need to keep an eye on this in the future and spend some more time looking at how this is happening.
Friday, December 30, 2011
2522 pump/valves
Aaron is ordering a new
The garage door guy was
Thursday, December 29, 2011
fire hydrant
Hydrant at 9th & Astor OOS
Sent from my iPhone
2523
2522
2522 Left side rear bottom warning light
P & L Johnson Mechanical
Wednesday, December 28, 2011
iTX gas monitor
Sent from my Windows Phone
Tuesday, December 27, 2011
Door 5 (Cont')
The repairman came today and worked on door #5. There is a bad control board, he is going to Portland tomorrow (Wednesday) and will pick one up. He reconnected the door and said it is ok to use, but is best controlled by the inside buttons. He opened up the junction box on the lower lefthand corner of the door and found it full of water. He has left this open for the time being.
The Chief and I investigated the vibrating cable and found the vibration to be conducted from the ceiling heater. The vibrations stop when the fan is turned off. Hopefully repairs will be completed by the end of the week.
Monday, December 26, 2011
Mega mover on 2522
This morning on a medical call Medix used our mega mover. We will try to regain one on our next call, but until further notice engine 2522 does not have one.
Thanks
Robert
Sunday, December 25, 2011
2523
2522 ABC Extinguisher
We used the 20 lbs ABC extinguisher off 2522 on a call today. We could not locate a replacement extinguisher for 2522. We temporarily placed the 20 lbs ABC extinguisher that was mounted by the shop on 2522 until we get the original extinguisher filled.
Thanks,
Brett
Sent from my iPhone
Saturday, December 24, 2011
Pressure washer
Tried to use the pressure washer on 12/24/11. Could not get it running. Does anybody know of this having an issue or is it new?
Lt. Corbit
Door five
Wednesday, December 21, 2011
Zoll E-Series Defibrillator
A/V equipment
Lt. Gascoigne
Tuesday, December 20, 2011
2541
Lost Ring
Hey Team,
A Medix employee named Kevin Posalski called today and said that he lost a solid band ring on a call in Astoria on either the 15th or 16th of December. He was wondering if anyone had possibly found his ring or if someone may have returned it to our station. If anyone has any information about the lost ring you may contact Kevin via mobile phone at (909) 553-4507.
Thanks,
Brett
Emergency light in front hall way at station 25
Monday, December 19, 2011
2523
FW: [firebulletin] PPE Face Piece Failure Report - NIST
Subject: [firebulletin] PPE Face Piece Failure Report - NIST
An article last week on ASM Internationals webpage shared a story about some recent work done in Chicago by NIST and SCBA Face Piece Failure. http://www.asminternational.org/portal/site/www/NewsItem/?vgnextoid=4d13d52c3f914310VgnVCM100000621e010aRCRD
National Institute of Standards and Technology (NIST), conducted experiments which demonstrated a range of realistic thermal exposures and environmental conditions that firefighters could be exposed to. Self-contained breathing apparatus (SCBA) facepieces were exposed to thermal environments from propane-fueled calibration experiments and furnished townhouse fire experiments. The rooms and the facepieces were instrumented to measure temperatures of the environment and the facepieces. The fire experiments lasted 5 minutes to 10 minutes and produced ceiling temperatures of approximately 500 °C (932 °F) to 750 °C (1382 °F) in the room adjacent to the fire. A heat flux gauge was also installed next to the facepieces and measured peak heat fluxes from approximately 2 kW/m2 to 55 kW/m2. Eight facepieces were tested in six different experiments, with three facepiece lenses showing evidence of thermal degradation from the exposure. Maximum exterior lens temperatures were as high as 300 °C (572 °F) in these cases. The environments that caused the failures were identified in an attempt to characterize the thermal performance of SCBA facepieces. Although much was learned about conditions associated with thermal degradation of SCBA facepiece lenses, more experiments are needed to be able to understand the thermal degradation and more definitively predict the conditions that are likely to cause a facepiece lens failure. For additional information on this study please go to the NIST webpage
http://www.nist.gov/manuscript-publication-search.cfm?pub_id=909917
To access the 45 page NIST report on this issue please go to: http://www.nist.gov/customcf/get_pdf.cfm?pub_id=909917
Genesis Spark Plugs
Mark
New mini TIC
-Brett
Sent from my iPhone
Friday, December 16, 2011
Thursday, December 15, 2011
Aerial test of 2541
Wednesday, December 14, 2011
Recycling
Subject: Recycling
A few notes on recycling. We seem to be having some issues: 1. Cardboard needs to be flattened. 2. Waste plastic and other trash needs to be removed from cardboard. 3. When placing recyclables outside remove items from plastic bags. Even clear plastic bags are trash. 4. Shredded paper should be placed in the blue commercial paper bin in the front of the building. 5. If you must place shredded papers in a red top recycling container they must be in a paper bag and stapled shut. 6. If the recycling bins are full don’t place items on the ground. Consider using the dumpster instead. 7. Consider walking your refundable containers to the apparatus bay.
Whelen M7 Red/White warning light
Tuesday, December 13, 2011
Door 5
No sooner than the garage door repair man fixed Door 3 than Door 5 began acting strangely. A few times yesterday is stopped part way down or went back up on its own. It hasn’t happened every time, just sometimes.
Monday, December 12, 2011
CERT vehicle (2564)
Repairs to CERT vehicle (2564): The bad brake light was repaired. The air horn was simply a blown 15 amp (BLUE) fuse. The fuse is easily found under the hood on the driver’s side next to the solenoid. It will probably go out again when subjected to heavy use.
Sunday, December 11, 2011
Christmas food drive
We put everything you need to decorate 2521 (Santa Rig) in this plastic container marked 2521 food drive lights and put it up in the loft.
For future reference we placed the speakers on a wood back board we got near the ready rack. We secured the back board to the back of the engine using the buckles from the back board and we secured the speakers using tie down straps to the back board. This worked out good we did not get any feedback from the microphone and the sound was excellent.
Saturday, December 10, 2011
Door 3
Thursday, December 8, 2011
JJ Astor
FW: CHANGE OF DATE! - Trauma Committee Meeting - December 21, 2011
Hello Again!
Unfortunately, something has come up and the Trauma Committee meeting needed to be rescheduled. The original date was Wednesday, December 14, 2011. The new date is one week later, Wednesday, December 21, 2011 at 12:00 p.m., in the Columbia Memorial Hospital 3rd Floor Pavilion Conference Room. Lunch will be provided. The updated meeting packet with agenda and previous minutes has been attached.
Please accept our apologies for the inconvenience.
We will see on December 21, 2011!
Tara Allen
Administration


