Thursday, October 27, 2011

Seismic Upgrade - Public Safety Building

FYI
  
From: Peter Curzon
Subject: Seismic Upgrade - Public Safety Building

As you know we have begun the seismic upgrade project by examining the integrity of the pylons. The condition of the structural support was key to determining anticipated costs. Since they passed, we can move forward with the original upgrade and remodeling plans.

There will be considerable upheaval to both sides of the building and I would expect this project to last through the end of next year. We intend to work with the contractors to minimize disruption but your patience and cooperation will be necessary. There is no getting around it, it will be an inconvenience.

We will be relocating some people to an office trailer (no trailer trash jokes) on the front lawn as the north wall will be demolished  - not to mention the noise and associated construction issues.

Yesterday the bids were examined for the HVAC upgrade (Aaron is the project manager) and that project will overlap some of these projects.

If you have any ideas – remembering that first it has to be related to seismic upgrades and second we only have a limited amount of discretionary funds – that will improve our combined “houses”, please see me. Now is the time to get involved not after it’s completed and it becomes the woulda, coulda, shoulda criticisms.

I will try to keep everyone updated as we move forward however do not hesitate to ask in person or e-mail.

FIRE:

Remodel the phone room, create locked storage for EMS equipment, relocate door next to Lieutenant’s office, relocate door openers and relocate hose racks. Enclose the opening in the boiler room. Remove bay 4 door and enclose it to provide lateral structural support. A double door will be installed to provide access to the storage area. Install roof access doors in the hose tower. Examine possibility of installing earthquake trigger system to automatically open bay doors. Proposed: install shore plug for portable generator.

POLICE:

Remodel squad area, armory and create office space for sergeants and wired interview room. Move north wall 3’ out. Move sidewalk and realign parking lot. Construct driveway access from Log Bronc.

EVIDENCE:

Remodel and install rolling rack storage system.

DISPATCH:

Expand Dispatch 10’ north, add work station and remodel EOC/Lunch room.

LOBBY:

Remodel the woman’s restroom into a unisex ADA compliant restroom. Convert men’s room into storage.

CONFERENCE ROOM:

Install fold down desks for EOC. Hopefully if there’s money left, buy new conference room furniture.