I am pleased to report that conditions at Station 2 were within acceptable limits during our visit this morning. The swing arm has been repaired and replacement of the air connection on 2523 has been scheduled. There is a minor air leak that we need to fix in the black iron pipe. Zack will be following up on that, unless someone else jumps in to fix it. Also Zack sprayed weeds last shift so we are expecting a good kill in a few weeks.

No comments:
Post a Comment